Port Klang Corridor Checks Are Open!
POS KERETASEMENANJUNG

CONTAINER PANELS / PORT KLANG

Treat the container as a separate handling chain.

Acceptance, placement, restraint, seal and release must be confirmed for the actual facility.

Open instruction panels
Acceptance
CONTAINER PANELS01 / 06

ORDERED PANELS / 01

One panel, one decision.

Keep the named input attached to its evidence and confirmation state.

  1. 01Acceptance

    Acceptance

    Confirm vehicle size, state and facility acceptance.

  2. 02Placement

    Placement

    Position the unit with planned clearance.

  3. 03Restraint

    Restraint

    Use an approved securing arrangement.

  4. 04Protection

    Protection

    Keep contact points and loose items controlled.

  5. 05Seal

    Seal

    Record the applied seal and container identity.

  6. 06Release

    Release

    Match receiving instructions before opening or collection.

BOUNDARY / 02

The confirmed facility controls the method.

A

Confirm

Facility, vehicle dimensions, restraint and release process.

B

Retain

Keep the issued record, dated evidence and acknowledgement together.

INPUT CHECK / WHATSAPP

Confirm the requirement before handover.

Chat on WhatsApp